Cases: Pier at Lemvig habour


« Back to cases

Submit a case of use
Pier at Lemvig habour
After being partially destroyed by a storm in 2013 the Eastern pier at Lemvig Harbour in the Northern part of Denmark had to be rebuilt in 2015. The new pier is 60 meters longer than the old one and therefore has enough space for additional 50 boats.

The species Basralocus was used for the main supporting structure, and chosen due to its tolerance towards sea-water. FSC-certified Azobe was also used for this project.
Case details
Country:Denmark
City:Lemvig
Year:2015
Place of construction:Lemvig habour
Constructed by:Wijma Kampen BV
Designed by:
Project owned by:Municapality of Lemvig
Wood supplied by:Wijma Kampen BV
FSC License Code:FSC N001811
Species used
Types of use
Bridges (Parts in contact with water or ground), Bridges (Parts not in contact with water or ground), Decking , Poles, Hydraulic works (seawater)
Pier at Lemvig habour Pier at Lemvig habour Pier at Lemvig habour Pier at Lemvig habour Pier at Lemvig habour Pier at Lemvig habour Pier at Lemvig habour Pier at Lemvig habour Pier at Lemvig habour Pier at Lemvig habour